Board bearer also used to support scaffold boards used for decking – Offer a telescopic inside cantilever reducing from either 3 boards or 2 boards down to 0 inside boards – Tested to BS EN 12811 – Ideally used in conjunction with double ended transoms – No fittings require removing, no boards have to be lifted and there is no disruption to existing scaffold